Plans for up to 900 rented homes and towers of up to 23 storeys at the Liberty in Romford go to councillors on 26 November. Officers recommend approval.
Plans to rebuild much of the Liberty shopping centre in Romford, with up to 900 homes above new shops, go before Havering’s Planning Committee on Thursday 26 November. Council planning officers recommend that councillors approve them.
The tallest building would be 23 storeys, on the Western Road side of the centre. All the homes would be built to rent, and between 5% and 10% of each phase would be let at a discount as affordable housing. The details are in the officers’ report to the committee on application P1573.25.
Overview
- What: part demolition and phased rebuilding of the Liberty, with up to 900 homes above shops, cafés and community space
- Tallest building: 23 storeys, in the Western Road part of the site
- Homes: all build to rent for at least 15 years; 5% affordable in phase 1, 5% in phase 2 and 10% in phase 3
- Shop space: a net loss of 11,649 square metres, about 29% of the centre’s retail floor area
- Parking: car-free apart from Blue Badge spaces
- Decision: Planning Committee, 7pm on Thursday 26 November, Council Chamber, Havering Town Hall
- Recommendation: approve, subject to a legal agreement and any direction from the Mayor of London
What would be built
The application is a hybrid. The first two zones are in full detail. The later zones are outline only, which fixes their maximum size but leaves the design for a later application.
The report splits the site into four zones:
- Zone 1, Western Road: 380 homes in three buildings of 10, 23 and 13 storeys. Building A broadly replaces Lambourne House.
- Zone 1a, Market Place, beside Swan Walk: 112 homes in two buildings of 6 and 10 storeys, with shops or cafés on the ground floor.
- Zone 2, the corner of Mercury Gardens and Market Place: up to 245 homes in buildings of up to 6 and 15 storeys.
- Zone 2a, Mercury House: the existing 12-storey office block would be converted into up to 100 homes.
The site covers about 4.3 hectares between South Street, Market Place, Mercury Gardens and Western Road. The report says it does not include the former Debenhams store, the Bull pub, 78 Market Place, the multi-storey car park at Mercury Gardens and Western Road, or the shops at 1 to 83 South Street.
The plans also include new public space. There would be about 1,870 square metres in front of a new Western Road entrance to the centre. A further 2,700 square metres of managed open space would sit on the roof of a disused car park in the middle of the site, which the report says cannot be used for cars because its ceilings are too low.
Fewer shops, but newer ones
The scheme would leave the centre with less shop space. The report puts the net loss at 11,649 square metres of commercial floor space, about 29% of the roughly 40,100 square metres of retail space there now.
Officers accept the loss. They point to the applicant’s own figures, which say a third of the existing retail space, about 13,200 square metres, was empty when the application was made. Most of the space lost would be on upper floors, including along Swan Walk and Lawrie Walk. Officers say the centre “largely retains” its 1960s layout, and that the scheme would give it units that are “more fit for purpose”.
Affordable homes
All the homes would be rented from a single landlord for at least 15 years. The legal agreement would require tenancies of at least three years, no letting fees and a complaints procedure backed by an ombudsman.
The affordable homes would be Discount Market Rent flats, let below the going rate. The commitment is 5% of phase 1, 5% of phase 2 and 10% of phase 3, measured by habitable room. On the illustrative design of 742 homes, that comes to 43 affordable flats, or 6%.
The report says a viability assessment showed, to the satisfaction of the council and the Greater London Authority, that the scheme could not afford any affordable housing on paper. It treats the 6% as “a very significant benefit”. The legal agreement would include early, mid and late reviews, so the share could rise if the finances improve.
What the developer would pay towards
If permission is granted, the legal agreement would include:
- £1,722,438 towards school places, for Zones 1 and 1a
- up to £1,357,129 towards GP or hospital capacity, unless the NHS asks for a health centre on site instead
- £250,000 towards more step-free access at Romford station
- up to £900,000 towards the ring road, streets and the Market Place, at £1,000 a home
- a carbon offset payment, currently estimated at £972,453
Future residents would not be able to get parking permits anywhere in the borough, except Blue Badge holders.
Who objected, and who supported it
The council received 26 public comments: 11 objections and 15 in support, according to the report. Objectors raised the height of the buildings, loss of light and privacy, the number of flats in Romford, pressure on schools and GPs, and the small share of affordable homes. Supporters said the scheme would halt the town centre’s decline, provide homes and improve the shopping centre and its walking routes.
Historic England said the site has “considerable potential” and that the buildings to be demolished do not add to the conservation area. But it noted that the 10 and 15 storey blocks sit near the conservation area boundary, where the Romford Masterplan suggests four to six storeys.
The council’s own heritage advice found some harm to the Romford Conservation Area and to the setting of the locally listed Bull pub on Market Place. Officers conclude that the benefits outweigh that harm.
Como Street car park returns the same night
The same meeting will also consider the plan for 138 homes on the Como Street car park, off North Street. Councillors deferred it in September. The applicant is a company wholly owned by the council.
The updated report says the drawings have not changed and the scheme still includes no affordable homes. Officers again recommend approval. They have added four new conditions:
- all construction traffic to use North Street only, with banksmen at the Como Street junction
- a piling and foundation method statement, after residents raised the risk of vibration to the Victorian homes in Como Street
- a bat survey before any trees are felled, after residents sent video of bats
- a delivery and servicing plan
The report records 161 representations on that application, 121 of them objections.
What it means for you
- You can watch or attend. The committee meets at 7pm on Thursday 26 November in the Council Chamber at Havering Town Hall, Main Road. The agenda page lists both applications.
- Speaking slots exist. The council’s rules give a registered objector, the applicant and ward councillors five minutes each on applications like these, at the chair’s discretion, according to the committee papers.
- Approval would not be the last word. The Mayor of London can still direct on the Liberty scheme. If the legal agreement is not signed by 30 June 2027, officers would have the power to refuse it.
- The shopping centre is not closing. The plan is a phased rebuild, and the report describes it as including the refurbishment of the existing centre. No start date or construction timetable is given.
We will report the committee’s decisions after the meeting.